How to Plan a Secure Data Centre Relocation (UK)
Quick Answer – What Is a Secure Data Centre Relocation?
- Technical discovery and asset auditing
- Risk assessment and migration planning
- Controlled shutdown and decommissioning
- Secure packing and chain-of-custody transport
- Server, network and storage removal
- Secure IT disposal for redundant kit
- Installation, configuration and testing at the new site
- Documentation, reporting and certification
Step 1 – Build a Detailed Asset Inventory
- Servers, switches, routers and storage devices
- Serial numbers and hostnames
- Power and connectivity dependencies
- Operational criticality
- End-of-life or redundant equipment
- Devices requiring secure erasure
Step 2 – Assess Business and Security Risks
- Operational downtime
- Application dependencies
- Data sensitivity
- Physical security
- Access control
- Hardware fragility
- Environmental considerations
- Security of personnel and vehicles
Step 3 – Plan the Decommissioning Process
- Shutdown procedures
- Power isolation
- Storage wipe requirements
- Removal of racks and cabling
- Identification of assets for disposal
- Packaging protocols
- Removal pathways within the facility
Step 4 – Ensure Secure Transport with Full Chain of Custody
- Vetted, in-house staff
- GPS-tracked vehicles
- No subcontractors
- Security seals
- Tamper-proof packaging
- Scanned asset logs
- Time-stamped handovers
Step 5 – Manage Redundant Equipment Securely
- Certified data erasure or destruction
- Secure transit to processing facility
- Testing, grading and redeployment (where viable)
- Parts harvesting
- Resale value recovery
- WEEE recycling with full documentation
Step 6 – Prepare the New Facility for Arrival
- Rack layouts
- PDU and power requirements
- Environmental controls
- Connectivity mapping
- Patch schedules
- Floor space and access paths
- Security and access permissions
Step 7 – Install, Reconnect and Validate
- Rack mounting
- Patch cabling
- Network and power configuration
- Firmware checks
- Application and service testing
- Validation of operational performance
Step 8 – Document and Report Everything
- Asset lists
- Move logs
- Travel documentation
- Certificates of destruction or erasure
- WEEE documentation
- Resale summaries
- Compliance evidence for audits




